The Southeast Saskatchewan Pipeline Division
is capable of operating from six to 10 pipeline spreads
at a time, each using between five and 50 workers.
Pipe diameters from 2" to 6"
are installed using ploughs, while chain trenchers are
used to bed in pipe between 2" and 24" in
diameter.
Each year, the division lays approximately
150 km of fiberglass pipe, 150-200 km of composite pipe,
and 100-150 km of steel pipe, mainly in the southeast
Saskatchewan and southwest Manitoba region. The division
also provides support for each of the Company's other
locations when needed.
QC & QA
The division adheres to current Quality
Control and Quality Assurance protocols, to satisfy
pressure component and pipeline construction requirements.
All CES employees are certified in required safety training
courses.
Equipment
CES Pipeline equipment includes:
- CRC 6"-20" boring machine
- 6 HydroVac trucks (equipped for winter
work)
- 3 Wolfe Plows (2"-8" poly
pipe, 2"-6" composite, 2"-4" steel
pipe)
- Tandem axle water trucks with high
pressure tri-plex pumps for hydro testing pipelines
- Sullair 900 CFM 300 PSI Compressor
with Dessicant Air Dryers (good to -50C dewpoint)
- FastFusion Mobile Trac machine (poly
pipe 3"-12")
- Cats (D6 - D9) with single and multi
shank rippers and topsoil cutters
- Sidebooms (583s to D3s and rubber
tire 580s)
- Iron Wolf topsoil mulcher (frozen
topsoil 8"-12" deep, 10' wide per pass)
All crews are equipped with Right
of Way signage, batter boards, small tools and consumables
required.