|
Standard Package Includes
- Structural supply
- Structural fabricating (CWM certified)
- Boiler branch notification
- Material receiving reports
- Piping fabrication (A.S.M.E.)
- weld mapping
- Canadian Registration (if required)
- Radiography
- Assembly
- Hydro testing
- Sand Blasting
- Prime/Paint
- Heat trace (optional)
- Insulating
- Building
- Q/C package
- Delivery
- Set/Tie In
|
Sample
Packages
- Recycle packages
- Field headers
- Disposal headers
- Injection headers
- Pig sender/receiver
- Separator packages
- Treater packages
- F.W.K.O. packages
- Pressure tank packages
- Air compressor packages
- Disposal pump packages
- Flare stacks
- Gas knock out drums
- Vapour recoveries
|