| Services:
Pipeline Construction
Carson Welding
and Maintenance is equipped with a full
line of company owned construction equipment and
qualified personnel to operate many simultaneous
spreads in accordance with CSA standard Z662.
| Capabilites |
Area Spreads |
Employees |
SouthEast Saskatchewan
SouthWest Saskatchewan
North/Central Alberta |
8-10
3-4
3-4 |
10-150
10-50
10-50 |
Presently our pipeline
division installs approximately 600-700 km of
pipeline each year, which is completed by our
many local area and mainline crews which travel
the four western provinces.
Types of Construction
Steel line 2" to 20"
Fiberglass line 2" to 10"
Polyethylene line 2" to 12"
Composite lines 2" to 6"
Line insertions 2" to 6"
Quality Assurance
To ensure customer satisfaction,
Quality Control and Quality Assurance Manuals
are in place to qualify all pressure components
and pipeline construction requirements.
Pipeline Equipment
Carson Welding & Maintenance
owns an extensive range of specialized pipeline
equipment.
- CRC
6"-20" Hydraulic Bending Machine
-
Six HydroVac Trucks, equipped for winter work
- Three
Wolfe Plows capable of ploughing 2"-8"
polyethylene pipe, 2"-6" composite
pipe and 2"-4" steel pipe to a depth
of 1.8 m
- Tandem
axle water trucks equipped with high pressure
tri-plex pumps for hydro testing pipelines
- Sullair
750 CFM 300 PSI Compressor complete with Dessicant
Air Dryers good to -50C Dewpoint
- FastFusion
Mobile Trac Machine capable of fusing poly pipe
from 3-12"
-
Cats from D6 to D9 equipped with single and
multi shank rippers and topsoil cutters.
-
Sidebooms from 583s to D3s and rubber tire 580s
- Pipeline
crews are equipped with job vans fully supplied
with R.O.W. signage, batter boards, small tools
and consumables to complete all types of pipeline
installations.
- See other Equipment
Projects
During the past 3 decades Carson
Welding has completed National Energy Board Pipelines,
numerous transmission line installations, gas
gathering projects and flow line and water injection
pipeline installations.
-
60 km 6" steel NGL line Alida to Cromer
Capacity Expansion Project (ACCE Project) NEB
regulated (Enbridge Pipelines)
- 21
km 8" steel gas transmission line (Trans
Gas)
- 40
km 6" polyethylene gas gathering NEB regulated
(Atco Midstream)
- 60
km 12" steel CO2 transmission line NEB
regulated (Souris Valley Pipelines)
-
8 km 20" steel Border Crude Oil Pipeline
Project (Husky Oil Operations Ltd.)
|