Elite About_Us Equipment Services Projects QA_Safety Contact_Us

 Welding
 Maintenance
 Facility Construction
 Environmental
 Design & Drafting
 Packaging
 Pipeline Construction
 Safety
 Sand & Gravel
 Site Preparation &  Lease Road Building

 

Services: Pipeline Construction

Carson Welding and Maintenance is equipped with a full line of company owned construction equipment and qualified personnel to operate many simultaneous spreads in accordance with CSA standard Z662.

Capabilites Area Spreads Employees
SouthEast Saskatchewan
SouthWest Saskatchewan
North/Central Alberta
8-10
3-4
3-4
10-150
10-50
10-50

Presently our pipeline division installs approximately 600-700 km of pipeline each year, which is completed by our many local area and mainline crews which travel the four western provinces.

Types of Construction

Steel line 2" to 20"
Fiberglass line 2" to 10"
Polyethylene line 2" to 12"
Composite lines 2" to 6"
Line insertions 2" to 6"

Quality Assurance

To ensure customer satisfaction, Quality Control and Quality Assurance Manuals are in place to qualify all pressure components and pipeline construction requirements.

Pipeline Equipment

Carson Welding & Maintenance owns an extensive range of specialized pipeline equipment.

  • CRC 6"-20" Hydraulic Bending Machine
  • Six HydroVac Trucks, equipped for winter work
  • Three Wolfe Plows capable of ploughing 2"-8" polyethylene pipe, 2"-6" composite pipe and 2"-4" steel pipe to a depth of 1.8 m
  • Tandem axle water trucks equipped with high pressure tri-plex pumps for hydro testing pipelines
  • Sullair 750 CFM 300 PSI Compressor complete with Dessicant Air Dryers good to -50C Dewpoint
  • FastFusion Mobile Trac Machine capable of fusing poly pipe from 3-12"
  • Cats from D6 to D9 equipped with single and multi shank rippers and topsoil cutters.
  • Sidebooms from 583s to D3s and rubber tire 580s
  • Pipeline crews are equipped with job vans fully supplied with R.O.W. signage, batter boards, small tools and consumables to complete all types of pipeline installations.
  • See other Equipment

Projects

During the past 3 decades Carson Welding has completed National Energy Board Pipelines, numerous transmission line installations, gas gathering projects and flow line and water injection pipeline installations.

  • 60 km 6" steel NGL line Alida to Cromer Capacity Expansion Project (ACCE Project) NEB regulated (Enbridge Pipelines)
  • 21 km 8" steel gas transmission line (Trans Gas)
  • 40 km 6" polyethylene gas gathering NEB regulated (Atco Midstream)
  • 60 km 12" steel CO2 transmission line NEB regulated (Souris Valley Pipelines)
  • 8 km 20" steel Border Crude Oil Pipeline Project (Husky Oil Operations Ltd.)